Aflevering 8. Let’S Execute

· Aflevering van de podcast: GROW-to-GO

Offshore wind and the winning tickets for the coming years “The offshore wind sector is entering a new phase requiring a massive manufacturing and installation scale-up. Building a subsidy-free offshore wind farm should not mean that the companies involved make losses. We have to be economically sustainable as an industry. Therefore, it is vital to innovate to reduce costs further.” Says Jan van der Tempel, Chairman of GROW. “Mind you, we have to build 1000 turbines annually to drive the global energy transition. To make this happen, we must speed up all processes and align the complete supply chain.” https://grow-to-go.nl/202207-lets-execute

Speelgoedwinkel
GROW-to-GO

GROW-to-GO

Gemaakt door: Grow to Go Eerste aflevering: 25-11-2022

De podcast GROW-to-GO heeft in totaal 17 afleveringen

Vorige aflevering

7. Install, Load, Repeat - MIDAS

7. Install, Load, Repeat - MIDAS

Maker: Grow to Go Datum: 10-05-2022

Volgende aflevering

9. The Next Airbender

9. The Next Airbender

Maker: Grow to Go Datum: 20-09-2022

Soortgelijke podcasts

Disclaimer: De podcast (artwork) is geembed op deze pagina en is het eigendom van de eigenaar/ maker van de podcast. Deze is niet op enige wijze geaffilieeerd met Online-Radio.nl. Voor reclamering dient u zich te wenden tot de eigenaar/ maker van deze podcast.

8. Let’s execute

GROW-to-GO · 07-07-2022

00:00 00:24:13